Track Units Operating Over Power-Operated and Dual Control Switches
Drill this chapter- 814Power-Operated Switches
- 815Dual Control Switches
- 816Foreman Requirements - Identifying Arrival and/or Departure of Movements
- 840.3Protection of Track Work at Automatic Interlockings Railway ....... Crossings at Grade
- 841Protection of Track Work on Non-Main Track and in Cautionary Limits
- 842Planned Protection – Rule 42
- 843Slow Track Protection – Rule 43
- 845Signal Placement Multi-Track
- 846Mounting of Signals