Switches
Drill this chapter- 104Hand Operated Switches
- 104.1Spring Switches
- 104.2Dual Control Switches
- 104.3Power-Operated Switches At A Stop Signal
- 104.4Semi-automatic switches
- 104.5Derails
- 105Operation on Non-Main Track
- 105.1Equipment left on siding
- 106Crew Responsibilities
- 107Restrictions at Passenger Train Stops
- 108Precautions While Switching
- 109Locomotive Engineer Precautions
- 110Inspecting Passing Trains and Transfers
- 111Train and Transfer Inspection
- 112Securing Unattended Equipment
- 113Coupling to Equipment
- 113.1Uncoupling From Equipment
- 113.2Moving Equipment After Coupling
- 113.3Switching with Air Brakes
- 113.4Restrictions
- 113.5Kicking Equipment
- 113.6Running Switch
- 113.7Gravity Drop
- 114Fouling Other Tracks
- 115Shoving Equipment
- 116Running Switch