Rule 13 — Engine Bell
- (a)The engine bell must be rung when:
- (i)an engine is about to move, except when switching requires frequent stopping and starting after the initial move;
- (ii)passing any movement standing on an adjacent track;
- (b)Should the engine bell fail on the lead locomotive in the consist, repairs must be made as quickly as possible. If repairs cannot be made the movement may proceed to the first point where repairs can be made. The engine bell if available on another locomotive in the consist will be rung continuously or operated by another member of the crew, when available, under the direction of the locomotive engineer.
- (iii)approaching, passing or moving about station facilities or shop track areas; and
- (iv)one-quarter of a mile from every public crossing at grade (except within limits as may be prescribed in special instructions) until the crossing is fully occupied by the engine or cars. At crossings where engine whistle signal 14(l) is applicable the engine bell need not be rung.
content_hash 39b7f946f24b2922