Rule 41 — Protection of Track Work on Non-Main Track and in Cautionary Limits
- (i)A movement required to operate on a track protected by a red signal between the rails or a switch locked with a special lock must be stopped before passing it and be governed by any instructions from the foreman.
- (ii)Only the foreman or an employee authorized by the foreman may remove the red signal and/or special lock.
- (iii)Equipment must not be left on the same track that will block a clear view of any red signal.
content_hash c9f05530be9228fc