Rule 85 — Track Release Reports
- (a)The conductor will ensure the RTC is promptly advised of the time their movement has arrived, left or cleared a location or at a time specified by the RTC or after clearing the limits of the last proceed clearance for that subdivision.
- (b)Prior to making such report, the conductor must confirm with other crew members the accuracy of the information to be provided.
- (c)When a track release report is transmitted to the RTC , the RTC must, as it is transmitted, verify the movement identification and record the location into the computer assisted system. If correct the locomotive engineer must confirm correctness of the report to the RTC .
content_hash a34e6c6ad3f5cfea